The probable trigger to the crash of American Flight companies Flight 191 is the irregular in shape stall as well as the ensuing roll of the plane due to the un-commanded retraction with the left wing outboard leading edge slats and the loss of booth warning and slat difference indication systems, resulting from maintenance-induced damage bringing about the separating of the number one engine and pylon set up at a vital point during take-off.

Adding to the cause of the accident were the weeknesses of the style of the pylon attach points to maintenance harm; the vulnerability of the type of the leading advantage slat program to the harm which produced asymmetry; zero FAA monitoring and confirming systems which in turn failed to detect and prevent the application of improper maintenance procedures; deficiencies in the practices and marketing communications among the providers, the manufacturer, plus the FAA which failed to decide and disseminate the information regarding previous maintenance destruction incidents; plus the intolerance of prescribed functional procedures to this unique urgent.

 Through numerous simulations from the accident, the NTSB determined that it would have been possible for a trip crew to recoup the plane in a situation like this encountered by crew of Flight 191, IF the crew had been fully aware of the specific situation and IF the crew had followed an extremely specific course of corrective actions.

When it comes to Flight 191, no one experienced ever predicted such a complex series of failures and procedures to handle the situation had under no circumstances been produced. Also, because of the failure with the stall warning and slat disagreement signals, it is likely that the crew was never completely aware of the specific situation, at least until it was too late in order to save the plane. The NTSB strongly disagreed with McDonnell Douglas’ analysis that the probability of engine detachment and subsequent system failure was extremely low for the DC-10. Finally, in the view of the NTSB, the crew of Flight 191 travelled the airplane in accordance with prescribed emergency procedures.

Structural and Mechanical Elements

The pylon is attached with left side using Spherical ball joints in three a forward bulkhead which is attached with structure inside the wing in front of the front an amount of spar. Another spherical joint at the rear of the ahead bulkhead transmits thrust loads from pylon structure right into a thrust hyperlink which in turn can be connected through another circular joint to structure around the lower surface of the side. The third add-on point is actually a spherical joint in the pylon aft bulkhead which hooks up to a clevis mounted on underneath of the wing. The pylons forward bulkhead and portions Gf the flange in the pylon?fters bulKhe3d possibly remained together with the separated Number 1 pylon or had been scattered along the runway. (See figures a couple of and 3. ) The No . 1 pylon’s hinder clevis connect assembly and portions of the pylon backward bulkhead, side thrust angle assembly and thrust link, and pylon forward bulkhead attach set up remained with the wing bolts which organised the bulkhead upper china were missing. The upper 12 inches in the pylon ahead bulkhead was bent forward about 30’and most of the ahead plate had been bent forwards an additional 10² to 15². The aft plate was broken under the thrust installing connection, and a large piece of the upper remaining corner was missing.

The design of the leading advantage slat system did not include positive mechanical locking equipment to prevent movements of the slats by external loads carrying out a failure from the primary controls. Certiasymmetrical leading edge slat state. At the time of DC-IO certification, the structural splitting up of an engine pylon has not been considered. Therefore, multiple failures of some resulting from this single celebration were not considered.

Contributing Elements

As stated over if the airline flight crew was trained in these types of failures, the accident may have never took place. Again, if the flight recorders did not are unsuccessful the alert would have stimulated and the pilots could have responded, before it was too late. The aircraft was equipped with a Fairchild Version A-100 CVR serial Zero 2935. On the other hand upon investigation the recordings were incomplete because of loss of electrical power during aircraft rotation. Also broken was the flight data recorders (DFDR) serial number 2298. Even though the unit suffered structural damage, without having evidence of fireplace or heat; the recorders tape was broken and spliced back together in two different places. IF registered 50 just a few seconds of data showing that the stabilizer trim setting for takeoff was 6th. 5* nose-up and modifications for höhe and mentioned airspeed were corrected.

Following your investigation the Investigators final thoughts were American Airlines along with all DC-10’s of the same types made notice of pylon attachment items during repair, and of the key edge slat system which will produced asymmetry. Meaning, also known as asymmetric blade effect and asymmetric dvd effect, is an aerodynamic phenomenon knowledgeable by a shifting propeller,[1] that is certainly responsible for irregular in shape relocation of the propeller’s middle of drive when aeroplanes is at a top angle of attack. There were deficiencies in the FAA’s surveillance and reporting systems in failure to detect incorrect maintenance techniques deficiencies in conversation between the aircraft operators, McDonnell Douglas, as well as the FAA in failing to provide details of past maintenance damage. Finally that is mentioned above, a total crew failure and knowledge on how to handle these particular pair of unique emergencies and scenarios.

The NTSB determined which the damage to the left side engine pylon had occurred during a tender engine change at the American Airlines airplane maintenance service in Tulsa, Oklahoma in March twenty nine and 35, 1979. Evidence came from the flange, a crucial part of the pylon assembly.

Investigation Board Findings

The engine and pylon assembly segregated either in or right after lift-off, the aft end of the pylon assembly began to separate in the forward flange of the back bulkhead plus the flight team was devoted to take-off. The structural parting of the pylon was created by a complete failure of the forward flange in the aft bulkhead after its residual power had been seriously reduced by the fracture and subsequent life span. The

overload break and exhaustion on the pylon aft bulkheads upper flange were the sole pre-existing harm on the bulkhead. The length of the overload crack and tiredness cracking was about 13 ins. The bone fracture was due to an upward movement of the aft end of the pylon which helped bring the upper flange and its nails into contact with the wing clevis.

The pylon to wing connect hardware was properly mounted as all attachments. Almost all electrical power towards the number one plane generator coach was dropped after the pylon separated. The captain’s flight director tool, the booth warning system, and the Gat disagreement warning light devices were delivered inoperative. Capacity to these busses was under no circumstances restored. The No . you hydraulic program was misplaced when the pylon separated capability throughout the air travel. Except for spoiler panels Number 2 Hydraulic systems Number 2 and No. 3 operated at all their lull with out. 4 on each of your wing, most flight handles were operating. The hydraulic lines and follow-up cables of the travel actuator pertaining to the still left wings severed box splitting up of the pylon ‘and the left wings right slats retracted during climb away. The-retraction from the slats caused an asymmetric stall.

Through the investigation, the development of the DC-IO maintenance plan and the inspection requirements pertaining to the wing pylons. This program guidelines were embodied in the “Airline company Maintenance Plan Planning Doc, 31%; -2.  The document was formulated with a working group composed of associates of consumer air carriers, McDonnell-Douglas, and a number of FAA observers. The file was after that submitted towards the FAA’ Maintenance Review Table where FEDERAL AVIATION ADMINISTRATION observers and engineers achieved to evaluate the proposals. The review table issued a study which prescribed the minimal work programs of each agent by its FAA principal maintenance inspector to maintenance program pertaining to DC-IO workers end necessary a: perspective of lean: specific insure conformance with all the program.

Recommendations

As a result of this kind of accident, the National Travel Safety Board Issue quickly an emergency Airworthiness Directive lo inspect most pylon affix points in all DC-IO aircraft by simply approved inspection methods. (Class 1 Immediate

Action) (A-73-41) Concern a telegraphic Airworthiness Directive to demand a pylon assemblage has been taken off and reinstalled for damage to immediate inspection of all DC-10 aircraft in which an engine the wing-mounted pylon aft bulkhead, including its forward flange and the attaching spar world wide web and nails. Require removal of any sealant which may cover a fracture in the flange area and employ eddy-current or additional approved ways to ensure detection of this kind of damage. (Class I, Urgent Action) (A-79-45) z Issue a Routine service Alert Program directing FEDERAL AVIATION ADMINISTRATION Maintenance pennsylvania inspectors lo contact -their assigned carriers and guide them to right away discontinue the practice of lowering and raising the pylon together with the engine still attached. Providers should stick to the procedure advised by the Douglas Aircraft Company Service Bulletin which includes taking away the engine from the pylon before getting rid of the pylon from the wing. (Class one particular Urgent Action) (A-79-06) Issue maintenance Alert Bulletin to US certificated air: carriers, and alert States that have. regulatory tasks over international air carriers functioning DC-IO plane, lo need appropriate structural inspections in the engine pylons following severe side a lot. (Class one particular Urgent Action) (A-19-52) engine failures involving significant discrepancy con Final results

Three days after the American Airlines Air travel 191 car accident the FAA Western area issued a telegraphic ADVERTISING which necessary visual inspection of the inside flange of each wing engine pylon backward bulkhead to get cracks and inspection or perhaps replacement of the bolts at the forward and aft ends of each side to pylon thrust hyperlink assemblies. On, may 29, 1979, the ADVERTISEMENT was ‘amended to require further inspections of AD was once again amended telegraphically to require reinspection of certain Model DC-10 series aircraft which had been through engine and pylon removal and installation. As a result of the inspections necessary by the changed AD, the FAA was informed from the, existence of cracks in the wing pylon assemblies of mounting assemblies. Therefore , on June six, 1979, the Administrator released the following Crisis Order of Suspension.

The issuance of 3 different Airworthiness directives employing inspections upon bolts, engine pylons, a complete re-inspection of specific DC-10 aircraft

that experienced undergone engine, pylon removal and reinstallation, as reaction to the examinations required by the AD, the FAA has been advised in the existence of cracks in the pylon mounting assemblies of certain aircraft and it seems that the plane may not fulfill the applicable qualification criteria in the FAR.

THEREFORE , IT IS BOUGHT, under specialist contained in Areas 609 and 1005(a) in the Federal Aviation Act of 1958, because amended, that Type Qualification No . A22WE issued to McDonnell-Douglas Organization be, and it hereby is, hung on an crisis basis, stated suspension to work on the day of this Order and until it is found by Administrator which the Model DC-10 series plane meets the applicable documentation criteria of Part twenty-five of the FAR and is eligible for a type certificate¦. 