restoration of central area reservoir research

Category: Environment,
Words: 629 | Published: 03.18.20 | Views: 636 | Download now

Flooding

National Park, New Direct, Environment, Microbiology

Excerpt from Research Paper:

Stated examples include: “cessation of mining or farming or perhaps causes of chafing, restricting animals from riparian areas, removing toxic materials from soil or sediments, and eliminating invasive exotic species; (4) restoration of processes/disturbance cycles and this requires restoration of important ecological processes which include natural surging or flames regimes to ensure that natural ethics is restored; (5) rehab of substrates which may be any kind of activity centered on repairing ground texture or chemistry which has been altered or maybe the restoration of hydrological routines or the top quality of normal water; (6) vegetation restoration which can include direct revegetation of the site and usually with types that are local to the community conditions with the environment. This requires collection of seeds or clippings from various sources in the local region; (7) Maintenance and monitoring the restoration site across period is required to ensure that objectives happen to be being fulfilled. Observation facilitates in learning when a thing additional has to be done to accomplish a successful restoration. (Vaughn, Porensky, Wilkerson, Balachowski, Peffer, Riginos, and Fresh, 2010, s. 1)

III. Description of Site

The Jackie Onassis Kennedy Reservoir was made of iron and earth and measures 1 . 58 mls in circumference. Croton Aqueduct pipes happen to be reported to have fed normal water into the water tank via the upper gatehouse. Drinking water was then distributed from your reservoir with the southern gatehouse’. ( ) it is reported that the explanation the Croton Aqueduct was decommissioned included that: (1) the water may well become infected by microbiology due to its open up air configuration; and (2) the Croton system was reconfigured which in turn made the reservoir obsolete. ( ) the reservoir is very attainable for fun uses and is threatened simply by environmental contamination. The following image shows the Jackie Onassis Kennedy Tank.

Figure 1

Source: The Croton Waterworks (2014)

As it can be seen the reservoir can be surrounded by the populated area of New York and is also a highly frequented site situated in the middle of Central Park. Excessive use of the region is likely to have worn apart vegetation and have worn away the sides of the water tank. The restoration project will certainly aim at restoring the all-natural vegetation to the area and on increasing the power of the tank in being a natural home to wildlife in the area.

IV. Spending budget the Task

Budgeting the project will require that checks be carried out on the water tank to determine the necessary equipments, labor, vegetation and also other required elements in concluding the restoration project. The first item budgeted needs to be an evaluation of the site that is complete for deciding the specific requires of the tank for restoration.

Summary and Conclusion

This study provides presented a plan for a repair of the Jackie Onassis Kennedy Reservoir found in the Middle of Central Park. The reservoir is usually an area that is highly attainable for recreational activities and it is very likely that these actions have resulted in environmental and ecological degradation and that the natural vegetation and wildlife through this reservoir happen to be threatened and this restoration in the reservoir should be used.

Bibliography

Environmental Restoration Alternative (2014) Humboldt State School. Retrieved via: http://humboldt.edu/environment/programs/environmental-science/ecological-restoration-option

The Croton Waterworks (2014) Recovered from: http://crotonaqueduct.wordpress.com/field-notes/individual-structures/jacqueline-kennedy-onassis-reservoir/

Vaughn, T. J., Porensky, L. M., Wilkerson, Meters. L., Balachowski